November 6th
Today, we performed a static load test. In total a 80 metric tons of load was placed, both symmetrically and assymetrically on the bridge during the test. The system was double checked by the team from the Slovak University of Technology in Bratislava, with the more traditional, mechanical equipment (see gallery).





